• HOME

  • Products

  • Support

  • Blog

  • About Us

  • Contact Us

  • SMT Feeder

  • SMT Nozzle

  • Pick And Place Machine

  • SMT Machine Part

  • Stencil Printer & Inspection Machine

  • Reflow Oven & Wave Solder

  • SMT Peripheral Equipment

  • SMT Consumables

  • YAMAHA Tape Feeder

  • JUKI Tape Feeder

  • Samsung Tape Feeder

  • FUJI Tape Feeder

  • Panasonic Tape Feeder

  • Siemens Tape Feeder

  • SMT Label Feeder

  • SMT Stick Feeder

  • SMT Feeder Parts

  • SMT Feeder Cart

  • YAMAHA Nozzle

  • JUKI Nozzle

  • Samsung Nozzle

  • FUJI Nozzle

  • Panasonic Nozzle

  • ASM/Siemens Nozzle

  • Yamaha Pick And Place Machine

  • JUKI Pick And Place Machine

  • Samsung Pick And Place Machine

  • FUJI Pick And Place Machine

  • Panasonic Pick And Place Machine

  • ASM/Siemens Pick And Place Machine

  • Samsung Mounter Part

  • JUKI Mounter Part

  • Yamaha Mounter Part

  • Fuji Mounter Part

  • Panasonic Mounter Part

  • ASM/Siemens Mounter Part

  • Printer Part

  • Reflow Oven Part

  • Wave Soldering Part

  • Binding/Die Bonding Machine Part

  • GKG Automatic Stencil Printer

  • DESEN Automatic Stencil printer

  • DEK Automatic Stencil Printer

  • Semi Automatic Stencil Printer

  • SAKI AOI Inspection Machine

  • SinicTek SPI Inspection Machine

  • TRI SPI Inspection Machine

  • TRI AOI Inspection Machine

  • Heller Reflow Oven

  • Ersa Reflow Oven

  • Ersa Wave Solder Machine

  • ETC Reflow Oven

  • TAMURA Reflow Oven

  • Vitronics Soltec Reflow Oven

  • BTU Reflow Oven

  • Thermal Profiler

  • Small Equipment

  • IC Tray

  • Loader and Unloader Machine

  • Conveyor Machine

  • Traffic Controllers

  • Buffers

  • Cleaning Machine

  • Feeder Calibration Instrument

  • Splicing Tools

  • ESD Products

  • Splicing Tape

  • ASM Spare Parts

  • PCB Thimble

  • Printing Scraper

  • After Sales

  • Download

  • FAQ

  • News & Events

  • Video Library

  • Technical Articles

Toggle navigation

SMT workshop production environment requirements

Mar 02, 2023
1. Load-bearing capacity, vibration and noise requirements of the plant
The bearing capacity of the plant floor should be greater than 8KN/m2
Vibration should be controlled within 70dB, and the maximum value should not exceed 80dB
Noise should be controlled within 70dBA.
 
2. Power supply
Generally, single-phase AC 220 (220±10%, 0/60Hz) and three-phase AC 380 (380±10%, 50/60Hz) are required, and the power of the power supply should be more than double the power consumption.
 
3. Air source
Configure the pressure of the air source according to the requirements of the equipment. The air source of the factory can be used, or an oil-free compressed air machine can be configured separately. The general pressure is greater than 7kg/cm2. Clean, dry and purified air is required, so it is necessary to degrease, dedust, and dewater the compressed air. Use stainless steel or pressure-resistant plastic pipes as air ducts.
 
4. Exhaust
Reflow soldering and wave soldering equipment need to be equipped with exhaust fans. For all hot blast stoves, the minimum flow rate of the exhaust duct is 500 cubic feet per minute (14.15m3/min)
 
5. Lighting
The ideal illuminance in the workshop is 800~1200LUX, at least not less than 300LUX. When the illuminance is low, local lighting should be installed in the inspection, repair, measurement and other working areas.
 
6. Working environment
Keep the workshop clean, free of dust and corrosive gases. The production workshop should have cleanliness control, and the cleanliness is controlled at: 500,000 grades.
The ambient temperature of the production workshop is 23±3°C, generally 17-28°C, and the relative humidity is 45%-70%RH.
Set up a suitable temperature and humidity meter according to the size of the workshop, conduct regular monitoring, and be equipped with facilities for adjusting temperature and humidity.
Request for quotation and Quotes Average quote returned in under 1 work day.
Invoice and Packing Slip Average invoice and packing slip returned in under 1 work day.
Shipment Spare Parts delivered on average 3-7 work days after receipt of payment. (Via DHL, UPS, FedEx, and TNT)
Desktop Website